Employer : Abu Dhabi General Services Company (MUSANADA)
Engineer : Italconsult
Contractor Value: AED. 338,976,325.60/-
The Project Comprising Three Zones; B2, B3 & B4 with a duration of 2 years. The major scope of works are,:
- Removal of existing Roads and reconstruction.
- Removal of most of the existing secondary Storm Water Network and construction of new secondary Storm Water Network with Ground Water Drainage.
- Removal of Main Storm Water Line (RCP) and replacing with larger diameter of main line.
- Construction of 14 substations and related installation of 33kV cables and LV cables.
- Construction of Bicycle Track(27 km).
- Construction of Irrigation Network
- Construction of Soft and Hard Landscaping with Furniture.
- Installation of Street Lighting Network in selected roads.
- Minor works for Sewer, Potable Water and Telecommunication Networks like adjustment of cover levels, demolish and refurbish chambers / manholes, protection works etc.